Hi guys, could really use some peace of mind! Just want to make sure I'm doing everything right before I actually do it so I don't mess anything up. So a quick summary, we have a website hosted on vps.net with CENTOS 6.9 + WHM v78.0.17 and we run WHMCS on it, we have been in business for 5+ years so there's a lot of data on our WHMCS, and thousands of customers. We want to update all the systems without any errors or downtime for our customers so we bought a new VPS (same host vps.net) with the same specs as the first VPS but with CENTOS 7.6 + WHM v78.0.17. MYSQL on both is 5.6.43. Most important thing for us is to finish the transfer with everything intact, especially WHMCS and our mysql database is about 25GB
So we plan on using the WHM transfer tool to move over the cpanel account for that website from the old vps to the new vps
----------------------------------
My current step by step plan for using the transfer tool:
These are the steps we are planning to take, please let me know if we are forgetting anything or if we should do anything different
1. Put WHMCS on maintenance mode & disable cloudflare
2. Run transfer tool on the new VPS
3. Change nameserver information on WHM + Cloudflare
4. Go to WHMCS and transfer over the license
Am I forgetting anything? And does anyone have any idea how long the transfer tool would take if the size of the cpanel is lets say 25-30GB, like are we talking less than hour or multiple hours?
----------------------------------
3 Questions:
1. After I add the nameserver to the new VPS, what should I change on the old VPS, like should I remove the nameserver info on the old VPS, etc.?
2. Oh and should I use express mode for the transfer tool? I saw this warning and kind of confused as to what it means exactly?
Only use the Express transfers feature if the remote server controls the authoritative name servers for the domain. If the remote server does not control the authoratative nameservers for the domain and you use this feature, DNS will not resolve. This will cause your sites to experience downtime.
https://documentation.cpanel.net/dis...erTool-Abtxfer
3. Also I have read that firewalls might interfere with the transfer tool, should I disable CSF on both VPS? Anything else I should disable while doing the transfer?
----------------------------------
Thanks in advance you guys are awesome!!
So we plan on using the WHM transfer tool to move over the cpanel account for that website from the old vps to the new vps
----------------------------------
My current step by step plan for using the transfer tool:
These are the steps we are planning to take, please let me know if we are forgetting anything or if we should do anything different
1. Put WHMCS on maintenance mode & disable cloudflare
2. Run transfer tool on the new VPS
3. Change nameserver information on WHM + Cloudflare
4. Go to WHMCS and transfer over the license
Am I forgetting anything? And does anyone have any idea how long the transfer tool would take if the size of the cpanel is lets say 25-30GB, like are we talking less than hour or multiple hours?
----------------------------------
3 Questions:
1. After I add the nameserver to the new VPS, what should I change on the old VPS, like should I remove the nameserver info on the old VPS, etc.?
2. Oh and should I use express mode for the transfer tool? I saw this warning and kind of confused as to what it means exactly?
Only use the Express transfers feature if the remote server controls the authoritative name servers for the domain. If the remote server does not control the authoratative nameservers for the domain and you use this feature, DNS will not resolve. This will cause your sites to experience downtime.
https://documentation.cpanel.net/dis...erTool-Abtxfer
3. Also I have read that firewalls might interfere with the transfer tool, should I disable CSF on both VPS? Anything else I should disable while doing the transfer?
----------------------------------
Thanks in advance you guys are awesome!!